Services to and from Cambridge rail station have been severely delayed and some have been cancelled as a result of Storm Doris.

An Abellio Greater Anglia spokesman said: “A plastic sheet caught on the overhead wire at Cambridge and loss of overhead line power at Great Chesterford is causing severe delays.”

For live updates on service alterations, visit https://www.journeycheck.com/greateranglia.